Service Name:
Design and Installation of Medical Gas Piping
1. Medical Gas Piping Design
Planning & Requirement Analysis
Identification of required medical gases:
Oxygen (O₂)
Nitrogen (N₂)
Carbon Dioxide (CO₂)
Compressed Air (Medical Air)
Vacuum/Suction
Analysis of flow rate and pressure requirements at each usage point
Determination of gas supply source: cylinders, cryogenic tanks, or on-site generators
Piping System Design
Piping Layout
Determining main pipeline and branch line routing
Separating pipelines for different gases to prevent cross-contamination
Defining locations of manifolds, outlets, and distribution panels
Material Specifications
Seamless copper pipes (medical grade) in accordance with ASME B31.3 or NFPA 99
Gas-compatible fittings and valves with color coding and gas identification labels
Regulators and pressure gauges to control pressure at each distribution point
Safety & Redundancy
Gas leakage and pressure-drop alarm system
Pressure relief valves to prevent overpressure conditions
Duplex manifold system to ensure continuous gas supply during maintenance
Design Documentation
Complete medical gas pipeline P&ID (Piping & Instrumentation Diagram)
2D/3D layout drawings of piping systems and supporting equipment
2. Medical Gas Piping Installation
Preparation
Site cleaning and pipeline route mapping according to design layout
Preparation of medical-grade copper pipes that have been degreased (oil-fre
Pipe & Equipment Installation
Installation of main pipeline from gas source to distribution panels using brazing with lead-free silver solder
Installation of gas outlets at usage points (e.g., cleanrooms, laboratories)
Installation of manifolds in utility rooms for cylinder or cryogenic tank connections
Control & Alarm System Installation
Gas pressure alarm panels installed in monitoring areas
Pressure sensors and flow meters integrated with SCADA/BMS systems for real-time monitoring
3. Pressure Testing & Validation
Pressure Test
Conducted using nitrogen or inert gas to test pipeline strength under high pressure
Ensures no leakage at joints and valves
Purging & Cleaning
Cleaning of pipelines to remove contaminants before introducing medical gases
Kualifikasi Sistem
IQ (Installation Qualification): verifies installation complies with design and standards
OQ (Operational Qualification): ensures system operates within defined parameters
Leak Test & Alarm Test: verifies alarm system functionality during leaks or low-pressure conditions
4. Standards & Regulations Used
NFPA 99: Health Care Facilities Code.
ASME B31.3: Process Piping Standard.
ISO 7396-1: Medical Gas Pipeline Systems.
CPOB/GMP Pharmaceutical facility requirements
Services Provided:
DESIGN
We create facilities that are safe, efficient, and compliant with regulations before entering the construction and operational stages.
EXECUTION
We transform designs into fully operational facilities with guaranteed quality, safety, and regulatory compliance.
BPOM ASSISTANCE
We support you in ensuring a smooth BPOM inspection process and obtaining the necessary certifications required for operation.