Service Name:

Design and Installation of Automation Systems including SCADA, PLC, or Relay

1. Automation System Design (SCADA & PLC/Relay)

Requirements Analysis

  • Identification of processes to be automated: mixing systems, HVAC, water treatment, or utilities

  • Definition of control parameters: temperature, pressure, flow, level, speed, and quality

  • Determination of automation level: manual, semi-automatic, or full automation


System Architecture

  1. PLC (Programmable Logic Controller)

    • Acts as the main controller for reading sensor signals, processing logic, and controlling actuators (pumps, valves, motors)

    • Programmable using ladder diagram, function block, or structured text

  2. Relay Control System

    • Used for simple operations such as motor start/stop and alarm on/off

    • Typically applied in small-scale systems or as manual backup

  3. SCADA (Supervisory Control and Data Acquisition)

    • Visual interface for real-time monitoring of all process parameters

    • Provides data logging, trending, and alarm functions for analysis

  4. HMI (Human Machine Interface)

    • Touchscreen panel at field level for operator control

    • Connected to PLC and SCADA for two-way communication

  5. Communication & Networking

    • Industrial protocols such as Modbus, Profibus, Ethernet/IP, and OPC are used to connect all devices

Control & Instrumentation Design

  • P&ID (Piping and Instrumentation Diagram) : defines sensor, actuator, and control panel positions

  • Control Philosophy : defines control logic, interlocks, alarms, and operating sequences

  • Redundancy : ensures system reliability (e.g., dual PLC or redundant SCADA servers)

2. Automation System Installation

Mechanical & Instrumentation Installation

  • Installation of sensors (temperature, pressure, flow) at process points

  • Installation of actuators such as motorized valves, pumps, and blowers

Electrical & Control Panel Installation

  • PLC, relay, and MCC (Motor Control Center) panels assembled in the workshop

  • Installation of signal cables, power supply, and communication networks to all devices

SCADA & HMI Integration

  • SCADA software installed on industrial servers or PCs

  • Integration with PLC for real-time process monitoring and control

3. Testing & System Validation

  • FAT (Factory Acceptance Test): testing control panels and logic before shipment

  • SAT (Site Acceptance Test): testing system functionality after installation on site

  • IQ/OQ/PQ:verification of installation, operation, and performance in compliance with CPOB/GMP standards

  • Alarm & interlock simulation: ensure system safety and reliability

4. Standards & Regulations

  • ISA-95 & ISA-88: industrial automation standards

  • 21 CFR Part 11 (FDA): data integrity requirements for pharmaceutical systems

  • GAMP 5: validation guideline for computerized systems in pharmaceutical industries

  • IEC 61131-3: PLC programming standards

Services Provided: